- What is the legal basis for BABA?
- What BABA Requires from Suppliers
- When Suppliers Are in Scope
- Material Categories That Drive Compliance
- Iron and Steel
- Manufactured Products
- Construction Materials
- Electronics and Technology Suppliers: A Common Blind Spot
- What Evidence Suppliers Are Expected to Provide
- BABA Waivers: What Suppliers Can and Can’t Rely On
- Where Suppliers Commonly Fail BABA Reviews
- How Suppliers Should Prepare for BABA
- How Regilient Supports Suppliers with BABA Compliance
- Final Takeaway
- Sources (checked 18 November 2026)
Last updated: 18 November 2026
In brief
The Build America, Buy America Act (BABA) sets domestic-content rules for iron and steel, manufactured products and construction materials used in federally funded infrastructure. OMB's rule in 2 CFR Part 184 has applied since 23 October 2023. Manufactured products face a 55% domestic component-cost test. Regilient tracks product origin and supplier evidence for suppliers.
If you supply products or materials into U.S. infrastructure projects, BABA is no longer something your customer handles for you. It directly determines whether your products are eligible or excluded.
The Build America, Buy America Act (BABA) sets domestic-content requirements for federally funded infrastructure. For suppliers, this means eligibility now depends on how and where products are manufactured, assembled, and documented — not just where final delivery happens.
This guide explains how BABA affects suppliers, what evidence is expected, and where most suppliers get exposed.
What is the legal basis for BABA?
BABA is part of the Infrastructure Investment and Jobs Act of 2021. The Office of Management and Budget (OMB) implements it for federal financial assistance through 2 CFR Part 184, whose revised guidance took effect on 23 October 2023. Source: Federal Register, vol. 88, no. 162 (23 August 2023).
Federal agencies apply the rule to their own programmes, so waivers and process details can differ by agency. Check the funding agency's page for the project.
What BABA Requires from Suppliers
At its core, BABA requires that infrastructure projects using federal funding rely on U.S.-manufactured materials and products.
For suppliers, that translates into three non-negotiables:
- Verifiable manufacturing locations
- Correct material classification
- Traceable documentation that can withstand review
If you can’t prove these, your product becomes a risk — even if it’s technically compliant.
When Suppliers Are in Scope
BABA applies when federal financial assistance supports an infrastructure project.
This includes projects involving:
- Transportation and transit systems
- Water and wastewater facilities
- Energy and power infrastructure
- Broadband and telecom networks
- Public buildings and community facilities
Important supplier reality:
> You do not need a direct federal contract to be in scope. > If your customer’s project uses federal funds, your products may fall under BABA.
Material Categories That Drive Compliance
BABA compliance hinges on how a supplied item is categorized. Misclassification is the most common failure point.
Iron and Steel
Iron and steel products must undergo all manufacturing processes in the United States, including:
- Melting
- Refining
- Rolling
- Forming
- Coating
Any foreign processing step disqualifies the product.
Manufactured Products
Manufactured products must meet U.S.-based manufacturing and assembly requirements.
This category often includes:
- Electrical equipment
- Mechanical systems
- Integrated assemblies
- Control units and modules
Final assembly location alone is not enough — manufacturing steps matter.
For manufactured products, OMB's rule uses a domestic-content test. The product must be manufactured in the United States, and the cost of its components mined, produced or manufactured in the United States must exceed 55% of the total cost of all components, unless another standard applies. Source: Federal Register, vol. 88, no. 162 (23 August 2023).
Construction Materials
Construction materials are frequently overlooked by suppliers.
This category includes:
- Non-ferrous metals
- Plastic and polymer-based products, including PVC and composite building materials
- Glass, including optic glass
- Fiber optic cable and optical fiber
- Lumber and engineered wood
- Drywall
These eight categories are the ones OMB lists as construction materials. Cement and concrete are not among them, so do not classify them here. Source: Federal Register, vol. 88, no. 162 (23 August 2023), 2 CFR Part 184. Minor additions of other materials or binding agents do not change a material's category.
Even when these materials are embedded inside larger systems, they must still meet U.S. manufacturing requirements.
Electronics and Technology Suppliers: A Common Blind Spot
Many suppliers assume BABA only affects construction materials. That assumption is wrong.
Electronics, sensors, controls, and IT equipment used in:
- Broadband expansion
- Smart infrastructure
- Energy systems
- Water treatment facilities
…are often classified as manufactured products or tied to construction material requirements.
Suppliers that previously passed domestic checks are now being flagged because BABA evaluates manufacturing origin more aggressively.
What Evidence Suppliers Are Expected to Provide
BABA compliance is evidence-driven. Verbal assurances and generic statements don’t survive review.
Suppliers should be prepared to produce:
- Country-of-origin declarations
- Manufacturing location details
- Assembly and transformation statements
- Material category justification
- Sub-supplier declarations where applicable
Documentation must be current, project-specific, and traceable.
BABA Waivers: What Suppliers Can and Can’t Rely On
Waivers exist, but suppliers should treat them as exceptions — not strategy.
Waivers may be issued for:
- Public interest considerations
- Non-availability of compliant U.S. products
- Excessive cost impact
Critical supplier takeaway:
> A waiver must be explicitly granted, documented, and tied to the specific project. > Assuming a waiver applies is a fast way to get disqualified.
Where Suppliers Commonly Fail BABA Reviews
Most failures are preventable. The patterns are consistent:
- Using “Made in USA” labels without BABA-specific proof
- Failing to classify materials correctly
- Relying on outdated or generic supplier declarations
- Not linking products to project funding sources
- Inability to produce evidence during audits
BABA failures are rarely about bad intent — they’re about weak documentation systems.
How Suppliers Should Prepare for BABA
Suppliers that stay eligible do four things consistently:
- Confirm applicability per project Never assume BABA applies — or doesn’t — without verification.
- Classify supplied products accurately Iron, steel, manufactured product, or construction material — this determines the rule set.
- Collect supplier-level evidence early Waiting until bid submission is already too late.
- Maintain audit-ready records Evidence should be retrievable, current, and defensible at any time.
How Regilient Supports Suppliers with BABA Compliance
Regilient enables suppliers to operationalize BABA compliance by providing:
- Product- and component-level country-of-origin tracking
- BOM validation aligned with BABA material rules
- Structured supplier declaration workflows
- Centralized, audit-ready documentation
Outcome: Suppliers reduce bid friction, avoid disqualification, and maintain defensible eligibility across federally funded projects.
Final Takeaway
BABA shifts compliance responsibility up the supply chain.
For suppliers, eligibility now depends on proof, not promises. If your products support federally funded infrastructure and you can’t clearly demonstrate where and how they’re manufactured, you’re exposed.
BABA compliance isn’t about interpreting the law — it’s about making your sourcing visible, verifiable, and defensible.
For checking suppliers against government lists, see our guide to denied party screening and sanctions compliance. For classification questions on imported components, read HS vs HTS code differences.
Talk to a Regilient compliance expert
Sources (checked 18 November 2026)
- Office of Management and Budget, Guidance for Grants and Agreements, 2 CFR Part 184 (Buy America Preferences for Infrastructure Projects), Federal Register, vol. 88, no. 162 (23 August 2023)
- Federal Register notice text for the construction materials and manufactured products definitions, via govinfo.gov (checked 18 November 2026)